Gas pipeline along the Karkaraly highway, Astana
Location:
Astana, Nura and Esil districts, along the Karkaraly highway
Project name:
"High-pressure gas pipeline at: Astana, Nura and Esil districts, along the Karkaraly highway — first start-up complex"
Expected funding sources and arrangements:
The project is to be financed from the national and local budgets under budget programme 012, "Development of the heat and power system".
Construction period:
2026
Total estimated construction cost
KZT 411,506.024 thousand at 2026 prices, including construction and installation works — KZT 311,222.052 thousand, equipment — KZT 13,303.348 thousand.
Description:
The project covered the design of an underground gas pipeline tied into the existing main, together with a cabinet-type gas pressure regulating unit (GRPSh) with primary and standby reduction lines. It sets out solutions for pipe laying, shut-off valve installation and safe operation of the system. The project ensures reliable and safe gas transport, reduces operating risks and meets current requirements for utility infrastructure.
  • development of detailed design documentation
  • design of external gas supply (GSN), cathodic protection (EKhZ), gas pipeline power supply (EG) and reinforced concrete structures (KZh).
  • coordination with existing utility networks
  • development of the construction organisation design (POS) and cost estimates
Site location plan
Gas pipeline — plan
Installation diagram of the cabinet gas control unit (GRPSh)
Structural design of the cabinet gas control unit (GRPSh)
Lightning protection (earthing plan)
Contacts
Address:
Astana, Saryarka district, Saryarka St., building 8/1, NP­19
Phone:
8 (778) 818-83-21
E-mail:
info@astanaliq.kz
Astanalyq Kazakhstan Engineering and Design Institute LLP
Made on
Tilda