Gasification of four villages in Kostanay Region
the settlements of Talapker, Osinovka, Abay and Novosyolovka, Kostanay Region.
"Construction of a supply and in-village gas pipeline in the villages of Talapker, Osinovka, Abay and Novoselovka, Kostanay district, Kostanay Region"
Expected funding sources and arrangements:
National budget. Budget programme administrator — the "Construction Department" state institution of the Kostanay District Akimat.
Total estimated construction cost
KZT 1,215,701.138 thousand at 2026 prices, including construction and installation works — KZT 915,848.213 thousand, equipment — KZT 16,977.768 thousand.
The project provides for the construction of a supply and in-village gas pipeline to gasify the settlements of Talapker, Osinovka, Abay and Novosyolovka in Kostanay Region. High-, medium- and low-pressure networks with a total length of over 43 km have been designed, together with 6 gas pressure regulating stations. System throughput exceeds 1,150 m³/h, providing a stable gas supply to housing and infrastructure. The project will improve living standards, secure a reliable energy supply and create conditions for the further development of these settlements.
- development of detailed design documentation
- design of the site plan (GP), external gas supply (GSN), cathodic protection (EKhZ), gas pipeline power supply (EG) and reinforced concrete structures (KZh).
- coordination with existing utility networks
- development of the construction organisation design (POS) and cost estimates
Installation diagram of the cabinet gas control unit (GRPSh)
Structural design of the cabinet gas control unit (GRPSh)
Lightning protection (air-termination mast)