Major overhaul of heating main TM-3 in Astana
Location:
Saryarka district, Astana, Akmola Region.
Project name:
Major overhaul of heating main TM-3 along pipeline T-1 from the junction with chamber UT-16 (intersection of A. Moldagulova and G. Potanin streets) to chamber UT-19 (near 5/1 A. Moldagulova St.).
Expected funding sources and arrangements:
budget financing under programme 029, "Development of the water supply and sanitation system".
Construction period:
2025 (4 months)
Total estimated construction cost
KZT 363,820.206 thousand, including construction and installation works — KZT 305,322.592 thousand, equipment, furniture and fittings — KZT 3,819.132 thousand.
Description:
The project upgrades a section of the TM-3 main heating network on A. Moldagulova St. (from G. Potanin St. to the area of building 5/1). 485 metres of large-diameter heating main (820–1020 mm) are being modernised. Pipes in polyurethane foam insulation with an operational remote monitoring system guarantee a stable heat supply to consumers even at extreme temperatures down to −40°C.
  • Heat mechanical design (TS)
  • Reinforced concrete structures (KZh) Heating networks.
  • Operational remote monitoring system (TS.SODK)
  • Construction dewatering (PSVP)
  • coordination of the building services with each other
  • development of the construction organisation design (POS) and estimate documentation
Site location plan
Heating network diagram
Heating network installation drawing
Structural section. Drainage manhole.
Structural section. Inspection manhole.
Certificate of acceptance into operation, TM-3
Contacts
Address:
Astana, Saryarka district, Saryarka St., building 8/1, NP­19
Phone:
8 (778) 818-83-21
E-mail:
info@astanaliq.kz
Astanalyq Kazakhstan Engineering and Design Institute LLP
Made on
Tilda